Before Production

From decision
to production start.

Process development

From feasibility to stable parameters. Sometimes weeks. Sometimes months. Material interaction, parameter windows, reproducibility under industrial conditions.

The goal is a process that works not once, but reliably — under the conditions of your production, not just the lab.

CAGILA NC path simulation — 4-axis tube cutting

System specification & co-development

Architecture derived from process constraints. Commercial platform, integrated solution, or custom-built — the choice reflects ownership and risk distribution.

An independent specification protects the customer's interest before the first offer is signed.

Source selection and beam delivery
Motion and synchronisation
Software and process control
Emission and contamination management
Multi-camera optical inspection system

Validation

FAT beyond checklists. SAT under real conditions. Early detection lowers cost of correction.

Ramp-up

A few feasibility tests rarely expose what sustained production will. Better addressed in design than discovered in ramp-up.

Reducing ramp-up risk is the most cost-effective investment in the entire project.

Validated production parts — ramp-up batch